Renewing paving joints: how to prepare the existing surface
Before adding new jointing material, check the existing surface. TERRABOND is intended for suitable block and slab paving laid in unbound, free-draining construction. Clear, clean and dry joints are the basis for installation.

Check the construction first
The construction must remain load-bearing, be designed for the actual loads and be permeable to water. An adequate surface fall is also required. TERRABOND is not suitable for impermeable construction, paving units laid in mortar or surfaces exposed to permanent wet conditions.
Follow the paving manufacturer's instructions and current good practice in paving construction. Check the suitability of the combination of paving and jointing material on a trial area.
Clear the joints to a depth of at least 4 cm
On surfaces that have already been jointed, clear the joints to a depth of at least 4 cm using oil-free compressed air or by scraping out and vacuuming. This depth is equivalent to 40 mm.
Deeper joints can be prefilled with a suitable free-draining material. The required filling depth for TERRABOND must still be maintained. The appropriate product type depends, among other things, on the existing joint width.
Remove dirt before jointing
Remove dirt and discolouration from the paving surface with suitable cleaning agents before installing the material. Then allow the paving surface and the sides of the joints to dry.
TERRABOND is installed dry. Moisture activates the binder during installation and can cause residue on the paving surface. The surface and sides of the joints must therefore remain dry before and during sweeping in.
Plan for the weather and the next step
Air and surface temperatures must be at least +8 °C during installation. There must be no frost during installation or for the following two days.
Preparation is followed by the complete installation process: sweep in the dry material, compact, top up, sweep clean, water thoroughly and allow to dry. The illustrated guide describes the sequence and the checks required at each stage.